Monday, March 16, 2015

kitchen diary, week 11: floors and whatnot.

Mar. 9-10 - Larry the hardwood finisher and his team sand, stain, and seal the hardwoods in the living room, dining room, hallway, and even the two closets we forgot about.  Since we forgot the hardwood ran into the closets, we didn't have them cleaned out.  The guys move everything from the closets into our bedroom.  Amanda silently wonders what sorts of embarrasing things she thought were safely hidden behind those closed doors.



Mark and Amanda spend two nights at Mark's parents house while our house is all fumey and the floors cannot yet be walked on. thank goodness for living close to the in-laws.

Mar. 11 - Mark and Amanda move back home after work. 

 
somewhere along the way, one of Amanda's shirts, a sweater, and a box of feminine products disappears. either they got left behind in Victoria's closet, or something more mysterious is going down. i'm really hoping for the former.


everything is still a bit fumey at home, so we relocate our small group to the local ice cream place for the evening, but leave the windows open to continue to air out. we decide its probably safe to sleep there.

 
 i wish you could all see these floors in person, because pictures don't do them justice. the difference from the original orange-hued finish to the new light-brown is subtle, but astounding. bonus: the basement door now swings the whole way open instead of getting stuck on the floorboards.

Mar. 12 - Amanda organizes two closets after work; the coat closet in the living room, and the linen closet in the hallway.  somehow, this takes all evening.

Mar. 13 - Amanda wipes down every surface in the kitchen; cabinets, shelves, drawers, countertops, both vertical and horizontal surfaces. Mark helps reach the parts Amanda is too short to reach, and sets up the tv and media dresser.


Mar. 14 - Mark moves furniture and rugs into the living and dining rooms.

 
 Amanda removes the last bits of packing material from all of the appliances. this is more frustrating than it should be, and takes longer than i could have ever imagined. we quit while we're ahead, run some errands, and spend the evening eating pie and watching youtube videos with friends.



Mar. 15 - we FINALLY move things into our kitchen cabinets! we have way more stuff than i realized. i seriously have no idea where we had all of this stuff stashed before.


the post-its are my organizational system, and our cheat sheet for where everything is right now. not all of the cabinets are full, and some are still completely empty, but we haven't moved any foodstuffs in yet. most of it should fit in our big pantry cabinet, but there is potential for some stuff to expand into other cabinets as appropriate.


also, curtains get hung, and we install a dimmer switch in the dining room. there is a big pile of empty boxes in the middle of the living room, we are working on a master list of the tiny things that will need to be done to truly be done-done,the furniture arrangement is subject to change, and there is the ongoing argument about rugs, but we are so happy with the way this has all turned out.


Monday, March 9, 2015

kitchen diary: week 10, paint.

ed. note: this might be the longest, most stretched-out paint job in the history of ever. we've been working on it when we can, which has already stretched over the past 4+ weeks. the goal is to get it done before the hardwood floors get refinished, so we wont have to be painting over our lovely new floors. so far we've done three coats on the ceiling, and have two coats on the kitchen walls. this is where our adventure picks up.

 Mar. 1 - Mark cuts in the gray paint along the ceiling, baseboards, and around all doorways, light switches, and outlets in the kitchen and hallway.  he also starts cutting in the teal paint around the ceiling of the living and dining rooms. 


Amanda paints a fresh coat or two of trim paint on all baseboards and door casings as necessary. also the window trim on the kitchen window. she manages to only smash her head into an upper cabinet once.

Mar. 2 - Mark works on a second coat of cutting in around everything everywhere. Amanda paints nothing because she does not have a steady hand and therefore cannot be trusted.  she buys groceries for the first time in probably a month, works out, makes dinner, and does some laundry instead.

Mar. 3 - Amanda rolls a coat of gray paint in the hallway after work. Mark finishes all the cutting in along the baseboards in the living and dining rooms.

Mar. 5 - snow day! instead of braving the treacherous roads and the 10" of snow and ice, we hunkered down for a full day of painting.


 a second coat of gray in the hallway, and two coats of the teal in the living and dining rooms. by the end of the day we are exhausted but all of the walls are the right color!


Mar. 6-8 - touchups everywhere. Mark takes the lead on this effort in between other fun weekend activities of duckpin bowling and a chocolate festival.  also, the china cabinet gets relocated to Mark's parents house. since the driveway is still a little icy from the snow and melt and refreeze, getting it loaded into the truck is part sledding, part skating, and a little bit of an adventure.


we wrap up the weekend with a glass (or two) of wine and dinner out to celebrate the end of this marathon paint job.

Larry the hardwood refinisher is coming on Monday and everything is going to be dusty and fumey for a few days, so we pack our bags to relocated for a couple days of living at Mark's parents house. the end is in sight!!!

Tuesday, March 3, 2015

kitchen diary: week 9, countertops and other finishing touches.

Feb. 23 - Mark fills the nail holes in the baseboards and casings.  Amanda paints a coat of trim paint over the caulk at the top of the baseboards to seal out dirt and dust.  this paint job seems like it is taking forever - there is a lot of prep work to be done, and not a lot of time to do it when we're only able to work on nights and weekends.  just one more reminder of how fortunate we are to not be doing all of this work ourselves.

Feb. 24 - we have countertops! well, at least a couple of them... some of them arrived a little damaged, and were sent back by our fantastic contractor/uncle.  should just be a couple day delay at most.

 
 
at some point this week, Mark puts a second round of patch in all the nail holes, but i dont remember the exact day that happened.    
 
Feb. 26-28 -  while Mark and Amanda are out of town, everything really comes together.


coutertops arrive (in great shape!) and are installed.  the plumber hooks up the sink and a water line to the fridge.  appliances are all installed, except the microwave is not yet vented - too much snow on the roof to be cutting holes up there right now.


the electricians install light fixtures, and wrap up a couple other (literal) loose ends. 


all of the mats and floor protection boards are removed, and the kitchen is officially fully functional!

Tuesday, February 24, 2015

kitchen diary: week 8, trim.

Feb. 16,18-20 -  carpenters install trim on everything: crown molding, door and window casing, toe kicks, and baseboards.

 
this is a huge job, and the results are flawless. just beautiful. it turns out the light rail (trim for under the upper cabinets) was fabricated incorrectly, so that is not yet installed. cabinet and drawer pulls are installed, with the exception of a couple drawers - we were about 6 pulls short in our order.


the last bits of wiring are run, and the recessed lighting gets its final touches - it all blends so nicely with the ceiling that i hardly even noticed it was done!

also, final decisions are made for the countertop, since a minor change from the supplier came up at the last minute.

Feb. 21 - Amanda takes a trip to the Depot to get all of the paint and a couple other random supplies. 
   Mark paints a third (and hopefully final) coat on the ceiling. He also caulks all of the baseboards in preparation for paint. the baseboards look great - makes me wonder why we didnt do this years ago.
   Amanda pulls nails out of the old shoe molding in case it can be reused, and watches a lot of Gilmore Girls on Netflix.

Feb. 22 - Mark moves the attic access.  the old access was tiny, and hidden in the closet in the guest bedroom.  it was accessible, but it was also kind of a pain: any time we wanted to get into the attic, we had to completely empty the closet and remove the shelf and hanging bar.


moving it was on the to-do list for some time down the line, but it got bumped to the top of the list so that our contractor/uncle has easier access in order to vent the microwave to the outside. 


now, the opening is larger, and located at the end of the hallway.  all it needs is a little nail filler and touch up paint.


Amanda shovels the driveway, and then spends the rest of the afternoon in bed because reasons.  we go out to eat because there is zero food in our house and go to bed early.

Monday, February 16, 2015

kitchen diary: week 7, hardwoods and cabinets.

Feb. 9 - Ed the hardwood guy patches the existing hardwood floors where the walls used to be, and installs new hardwood in the new dining room.  He is a magician.  You can't even tell that there used to be a wall there. the floor is gorgeous.


there is a flush transition along the long opening from the dining room to the kitchen(!), and there will be a tiny stepped transition through the smaller doorway up into the kitchen from the living room.

(clockwise from top: tile, transition turnboard, new wood, old wood)
 
Mark and Amanda spend the evening (into the early morning) painting the entire ceiling, and the few walls in the kitchen that will not eventually be covered by cabinets or the backsplash. one late night yields two coats on everything, although a third coat might be necessary in some areas. it's nice to have the bulk of the painting done though, before the cabinets are installed.



Feb. 10 - THE CABINETS ARE HERE! our house is full of brown paper packages tied up with string filled with our pretty pretty cabinets! the pendant light for over the sink also arrives, although for some reason we recieve two of them. but one of them is broken, so its nice to have a replacement already on hand.


after work, Mark grouts the kitchen floor and i dont know how its possible but that floor has gotten even prettier. 



Amanda paints small patches of the living room wall color (SW-Calico) where the kitchen and dining room meet, and around various light switches and outlets.

Feb. 11 - Will the carpenter arrives to start the cabinet installation. the first words out of his mouth are "wow that floor looks awesome" and my entire week is made. about half of the base cabinets get installed, and we already have more storage than we used to have in the old kitchen.



Feb. 12 - the rest of the base cabinets get installed on the fridge wall, including the peninsula. 


and we have appliances! they're not hooked up, but they are in our house and like everything else they are lovely!!! i toyed briefly with the idea of white appliances (since that is a style that is apparently making a comeback) but there were more options with the stainless so that's what we ended up with.


Feb. 13 - upper cabinets are installed and the countertop gets templated. (the plywood in the pictures is ultra-temporary - it is not the template)



i can't get over how amazing this whole renovation has been so far, how great all the guys have been to work with, and how pretty everything is.  it really is beginning to feel like a kitchen in here!

Feb. 14-15 - contractor/uncle does some prepwork for the trim (crown molding and door/window casings to be installed next week) and Amanda determines the placement for the cabinet hardware and the downrod length of the sink pendant. the estimated project schedule has everything getting wrapped up by the first week in March, so it seems like we are getting into the home stretch. is it too early to start planning my birthday party??

Monday, February 9, 2015

kitchen diary: week(end) 6, tile.

Feb. 6 - the last bit of necessary tile prep - Ditra (waffle board) - is installed in the kitchen.  since it gets set with thinset, it can't be walked on until it dries overnight.


evening painting plans get postponed, and we do some much-needed laundry instead.

Feb. 7 - three Marks convene to tile the kitchen floor - husband Mark, cousin Mark, and Uncle Mark.


hilarity ensues as Mark asks Mark to hand Mark the pencil to mark the floor with a line from mark to mark. (no lie - that was practically verbatim) everyone becomes hyper-aware of the work 'mark' for the rest of the day


while husband Mark marks and trims the edges of every. single. silver tile so they match the size of the slightly smaller darker gray tiles, the other Marks prep the floor in the new dining room for hardwood by installing several layers of roofing felt paper under plywood to match the height of the old subfloor.

this is true love. 

and then its all tile, all day.  Uncle Mark lays most of the tile, husband Mark does most of the cuts, cousin Mark does everything else, and Amanda brings the Marks lunch.  by the end of the night, most of the tile is laid in the kitchen - and it is super gorgeous!

gotta love a good diagonal checkerboard
 
Feb. 8 - after church, husband Mark finishes tiling the remaining corners of the kitchen.
 

Amanda helps by keeping Mark company, being his go-fer, and also laying one tile. it is tiny and unnecessary and will ultimately be completely covered by cabinetry, but she did that one sad little tile all by herself and is inordinately proud of that.

 (my tile)

tile and cleanup run well into the evening, but the long hours are well worth it. the tile floor is set and ready for grout by the end of the weekend and things are really beginning to shape up.


 
coming soon: hardwood and cabinets! get excited!
 


kitchen diary: week 6, drywall and paint.

Feb. 1 - we talk schedule and budget with contractor/uncle, everything is looking good.  decisions are made about hardwood stain color, paint color, and kitchen faucet.

(the color on the far right is the winner. the gray is for the hallway) 

we discover that our floor tiles are two different sizes (sad trombone).  thankfully, it is a fixable issue with just a little more time/energy investment and i will still be able to have my checkerboard kitchen floor. 


trip to Lowes for kitchen sink pendant light, giant bucket of primer, and space heater for the basement. can't find small, simple light fixtures for the hallway - they just don't make 'em like they used to.

Feb. 2 - realize we bought the wrong pendant light. order the right one, add 'return pendant light' to to-do list. drywall joints all get sanded nice and smooth and pretty.



Feb. 3 - realize we can't get the faucet we like. back to the drawing board on that particular decision. hardwood arrives to hang out and acclimate for a while, and studs get marked. 


Mark and Amanda cut in all the corners of the new drywall and around all the electrical boxes and light-holes with primer. we roll primer on one and a half walls, just to avoid having to dump the extra paint back into the bucket.

(apparently Amanda gets weird when painting late at night) 

Feb. 5 - 3/4" subfloor gets installed in the kitchen, and WE HAVE LIGHTS! most of the cans for the recessed lighting are installed, and about half of them have lightbulbs and it is SO bright i love it!



Mark and Amanda spend the evening finishing up a coat of primer on all of the new drywall on the ceiling and in the hallway and kitchen, and pick a grout color.  

 

yay for our newfound ability for photography after dark!

more to come to round out the week/weekend, but that deserves a post all its own...